---
title: Resource Library | project management
description: project management | Product development and engineering thought pieces, guidance, research, and how-to's for mechanical, electrical, systems, and software.
---

# The BES Blog

From How To's to engineering best practices and musings.

### Posts by Tag

- [Design (9)](https://www.boulderes.com/resource-library/topic/design)
- [Design for Manufacture (9)](https://www.boulderes.com/resource-library/topic/design-for-manufacture)
- [Testing (8)](https://www.boulderes.com/resource-library/topic/testing)
- [Mechanical (7)](https://www.boulderes.com/resource-library/topic/mechanical)
- [Mechanical Engineering (7)](https://www.boulderes.com/resource-library/topic/mechanical-engineering)
- [Product Development (7)](https://www.boulderes.com/resource-library/topic/product-development)
- [DFM (6)](https://www.boulderes.com/resource-library/topic/dfm)
- [Prototype (6)](https://www.boulderes.com/resource-library/topic/prototype)
- [project management (6)](https://www.boulderes.com/resource-library/topic/project-management)
- [electrical (5)](https://www.boulderes.com/resource-library/topic/electrical)
- [Embedded (4)](https://www.boulderes.com/resource-library/topic/embedded)
- [Machining (4)](https://www.boulderes.com/resource-library/topic/machining)
- [Materials (4)](https://www.boulderes.com/resource-library/topic/materials)
- [Plastics (4)](https://www.boulderes.com/resource-library/topic/plastics)
- [Aircraft Design (3)](https://www.boulderes.com/resource-library/topic/aircraft-design)
- [Fatigue (3)](https://www.boulderes.com/resource-library/topic/fatigue)
- [Injection Molding (3)](https://www.boulderes.com/resource-library/topic/injection-molding)
- [Material Failures (3)](https://www.boulderes.com/resource-library/topic/material-failures)
- [Quality Control (3)](https://www.boulderes.com/resource-library/topic/quality-control)
- [Software (3)](https://www.boulderes.com/resource-library/topic/software)
- [Systems Engineering (3)](https://www.boulderes.com/resource-library/topic/systems-engineering)
- [aesthetic (3)](https://www.boulderes.com/resource-library/topic/aesthetic)
- [Design For Test (2)](https://www.boulderes.com/resource-library/topic/design-for-test)
- [Metal Failure (2)](https://www.boulderes.com/resource-library/topic/metal-failure)
- [Metal Fatigue (2)](https://www.boulderes.com/resource-library/topic/metal-fatigue)
- [PCB Design (2)](https://www.boulderes.com/resource-library/topic/pcb-design)
- [PCBA (2)](https://www.boulderes.com/resource-library/topic/pcba)
- [Standards & Certifications (2)](https://www.boulderes.com/resource-library/topic/standards-certifications)
- [Test Driven Development (2)](https://www.boulderes.com/resource-library/topic/test-driven-development)
- [component selection (2)](https://www.boulderes.com/resource-library/topic/component-selection)
- [3D-Print (1)](https://www.boulderes.com/resource-library/topic/3d-print)
- [CAD (1)](https://www.boulderes.com/resource-library/topic/cad)
- [CNC (1)](https://www.boulderes.com/resource-library/topic/cnc)
- [Colorado Companies to Watch (1)](https://www.boulderes.com/resource-library/topic/colorado-companies-to-watch)
- [Computer-aided Design (1)](https://www.boulderes.com/resource-library/topic/computer-aided-design)
- [Concepting (1)](https://www.boulderes.com/resource-library/topic/concepting)
- [DFA (1)](https://www.boulderes.com/resource-library/topic/dfa)
- [Design Requirements (1)](https://www.boulderes.com/resource-library/topic/design-requirements)
- [Design Specifications (1)](https://www.boulderes.com/resource-library/topic/design-specifications)
- [Disk Image (1)](https://www.boulderes.com/resource-library/topic/disk-image)
- [Docker (1)](https://www.boulderes.com/resource-library/topic/docker)
- [Electromagnetics (1)](https://www.boulderes.com/resource-library/topic/electromagnetics)
- [Electronic Protection (1)](https://www.boulderes.com/resource-library/topic/electronic-protection)
- [End of life (1)](https://www.boulderes.com/resource-library/topic/end-of-life)
- [Engineering Award (1)](https://www.boulderes.com/resource-library/topic/engineering-award)
- [Environment (1)](https://www.boulderes.com/resource-library/topic/environment)
- [Fabrication (1)](https://www.boulderes.com/resource-library/topic/fabrication)
- [Functional Circuit Test (1)](https://www.boulderes.com/resource-library/topic/functional-circuit-test)
- [IP Rating (1)](https://www.boulderes.com/resource-library/topic/ip-rating)
- [Ideation (1)](https://www.boulderes.com/resource-library/topic/ideation)
- [Ingress Protection (1)](https://www.boulderes.com/resource-library/topic/ingress-protection)
- [Insider (1)](https://www.boulderes.com/resource-library/topic/insider)
- [Licensing (1)](https://www.boulderes.com/resource-library/topic/licensing)
- [Metal Forming (1)](https://www.boulderes.com/resource-library/topic/metal-forming)
- [Modular Prototyping (1)](https://www.boulderes.com/resource-library/topic/modular-prototyping)
- [Onshape (1)](https://www.boulderes.com/resource-library/topic/onshape)
- [PCB Layout (1)](https://www.boulderes.com/resource-library/topic/pcb-layout)
- [PCB Silkscreen (1)](https://www.boulderes.com/resource-library/topic/pcb-silkscreen)
- [Problem Solving (1)](https://www.boulderes.com/resource-library/topic/problem-solving)
- [Processing (1)](https://www.boulderes.com/resource-library/topic/processing)
- [Product Testing (1)](https://www.boulderes.com/resource-library/topic/product-testing)
- [Repositories (1)](https://www.boulderes.com/resource-library/topic/repositories)
- [Software Automation (1)](https://www.boulderes.com/resource-library/topic/software-automation)
- [Software Comparison (1)](https://www.boulderes.com/resource-library/topic/software-comparison)
- [Solidworks (1)](https://www.boulderes.com/resource-library/topic/solidworks)
- [Test Engineering (1)](https://www.boulderes.com/resource-library/topic/test-engineering)
- [Waterproofing (1)](https://www.boulderes.com/resource-library/topic/waterproofing)
- [microcontroller (1)](https://www.boulderes.com/resource-library/topic/microcontroller)
- [raspberry pi (1)](https://www.boulderes.com/resource-library/topic/raspberry-pi)

[See all](https://www.boulderes.com/resource-library/topic/project-management#)

 Topic

# project management

[![What Did We Make and Why - Concepting/Ideation](https://www.boulderes.com/hs-fs/hubfs/whatwemake2.jpg?width=400&upsize=true&name=whatwemake2.jpg) ](https://www.boulderes.com/resource-library/what-did-we-make-and-why-2)

[Design](https://www.boulderes.com/resource-library/topic/design) [project management](https://www.boulderes.com/resource-library/topic/project-management) [Product Development](https://www.boulderes.com/resource-library/topic/product-development) [Prototype](https://www.boulderes.com/resource-library/topic/prototype) [Ideation](https://www.boulderes.com/resource-library/topic/ideation) [Concepting](https://www.boulderes.com/resource-library/topic/concepting) [Problem Solving](https://www.boulderes.com/resource-library/topic/problem-solving)

##### [What Did We Make and Why - Concepting/Ideation](https://www.boulderes.com/resource-library/what-did-we-make-and-why-2)

**What Did We Make and Why - Concepting/Ideation**

This is the second blog post in a three part...

[ Read More ](https://www.boulderes.com/resource-library/what-did-we-make-and-why-2)

[![What Did We Make and Why](https://www.boulderes.com/hs-fs/hubfs/Feature_Brett.jpg?width=400&upsize=true&name=Feature_Brett.jpg) ](https://www.boulderes.com/resource-library/what-did-we-make-and-why)

[Design](https://www.boulderes.com/resource-library/topic/design) [project management](https://www.boulderes.com/resource-library/topic/project-management) [Product Development](https://www.boulderes.com/resource-library/topic/product-development) [Prototype](https://www.boulderes.com/resource-library/topic/prototype)

##### [What Did We Make and Why](https://www.boulderes.com/resource-library/what-did-we-make-and-why)

**What Did We Make and Why - The Problem Statement**

This will be a brief, candid blog post discussing...

[ Read More ](https://www.boulderes.com/resource-library/what-did-we-make-and-why)

[![The Non-Linear Nature of Engineering Development](https://www.boulderes.com/hs-fs/hubfs/nonlinear_engineering_cover.jpeg?width=400&upsize=true&name=nonlinear_engineering_cover.jpeg) ](https://www.boulderes.com/resource-library/the-non-linear-nature-of-engineering-development)

[project management](https://www.boulderes.com/resource-library/topic/project-management)

##### [The Non-Linear Nature of Engineering Development](https://www.boulderes.com/resource-library/the-non-linear-nature-of-engineering-development)

When we talk about engineering and engineers, we often immediately think of wonky-looking...

[ Read More ](https://www.boulderes.com/resource-library/the-non-linear-nature-of-engineering-development)

[![Project Life Cycle](https://www.boulderes.com/hs-fs/hubfs/committed_life_cycle_costs-466790-edited.png?width=400&upsize=true&name=committed_life_cycle_costs-466790-edited.png) ](https://www.boulderes.com/resource-library/project-life-cycle)

[project management](https://www.boulderes.com/resource-library/topic/project-management) [Systems Engineering](https://www.boulderes.com/resource-library/topic/systems-engineering)

##### [Project Life Cycle](https://www.boulderes.com/resource-library/project-life-cycle)

# Early definition is critical, changes late in the game are killers.

Most things humans build, be...

[ Read More ](https://www.boulderes.com/resource-library/project-life-cycle)

[![When to Build VS. When To Buy](https://www.boulderes.com/hs-fs/hubfs/decisions-088217-edited.jpeg?width=400&upsize=true&name=decisions-088217-edited.jpeg) ](https://www.boulderes.com/resource-library/when-to-build-vs.-when-to-buy)

[project management](https://www.boulderes.com/resource-library/topic/project-management) [Systems Engineering](https://www.boulderes.com/resource-library/topic/systems-engineering) [Design for Manufacture](https://www.boulderes.com/resource-library/topic/design-for-manufacture)

##### [When to Build VS. When To Buy](https://www.boulderes.com/resource-library/when-to-build-vs.-when-to-buy)

# The Problem

Many modern engineering projects are comprised of a variety of sub-systems which all...

[ Read More ](https://www.boulderes.com/resource-library/when-to-build-vs.-when-to-buy)

[![Accelerated Schedules](https://www.boulderes.com/hs-fs/hubfs/gantt_chart.jpeg?width=400&upsize=true&name=gantt_chart.jpeg) ](https://www.boulderes.com/resource-library/accelerated-schedules)

[project management](https://www.boulderes.com/resource-library/topic/project-management)

##### [Accelerated Schedules](https://www.boulderes.com/resource-library/accelerated-schedules)

Project management is a vital part of any consulting project and incorporates many factors. This...

[ Read More ](https://www.boulderes.com/resource-library/accelerated-schedules)